ökia European AI Grid
Join Consortium
A German-led Consortium 50.7374° N · 7.0982° E · est. 2026

ökia.
The European
AI Grid.

Power on one side. Intelligence on the other. One grid. Built across Germany — extended across Europe.

ökia federates the eight layers required to make sovereign AI real at continental scale: behind-the-meter power, modular AI factories, sovereign compute and cloud, European models, grid security, national off-take, and project finance.

Sovereign by design — not by retrofit.

Capacity 200 MW
Behind-the-meter, accessible
Sites 7
Germany · Phase I
Stack 8 Layers
Power → Finance, federated
Sovereignty 100%
European control · operator-grade
01 Manifesto

A grid, not a data center.

Hyperscale was an American answer to an American problem. Europe needs a different topology — distributed, federated, and grid-native. ökia is built on that thesis.

AI is becoming infrastructure — like electricity once did. Europe will not buy its sovereignty from a hyperscaler. It will build it, the way it built the power grid: federated, regulated, and locally owned.
The thesis

Compute is the new load. AI factories are the new substations. Models are the new utilities.

The continent that masters distributed AI infrastructure — co-located with stranded power, knitted into the grid, financed by European capital — controls the next twenty years of European industry.

That continent has to be Europe. That country leads is Germany. That consortium is ökia.

P-01

Behind-the-meter, by default.

Co-locate AI compute with stranded or industrial power. No grid bottleneck. No interconnect queue. Months, not years.

P-02

Modular & containerized.

Deploy in industrial cells of 1–10 MW. Brownfield-first. Move at the speed of factory build-outs, not real-estate cycles.

P-03

Federated, not centralized.

One network, many nodes. Workloads route to the cleanest, cheapest, closest electron — not the largest building.

P-04

Sovereign by construction.

European silicon paths, European cloud, European LLMs, European banks. Compliance is the architecture.

02 The Stack

Eight layers. One operator.

Every layer of the sovereign AI stack — from the megawatt to the model to the off-taker — assigned to a best-in-class European actor. ökia operates the seam between them.

L8
Finance

Capital

European banks · DFI · sovereign fundsProject finance, off-take backed structures, Series A/B equity.
€10 M+ convertible
€100 M pre-money cap
€500 M+ project finance pipeline
L7
Demand

National Off-take

Deutsche TelekomAnchor consumer of sovereign compute. National AI off-taker for enterprise & public sector.
B2B AI inference
Public-sector tenants
Edge-to-core distribution
L6
Models

Sovereign LLMs

Aleph Alpha · Cohere · open weightsEuropean foundation models, fine-tuning, inference orchestration.
Multilingual (DE/FR/EN/IT/ES)
EU AI Act compliant
Domain-tuned variants
L5
Cloud

Sovereign Hyperscaler

StackITGerman sovereign cloud control plane. BSI-aligned, GDPR-native, no extraterritorial reach.
EU data residency
BSI C5 / SecNumCloud paths
K8s / Ray native
L4
Compute

GPU Plane

NVIDIA · AMDBlackwell & Instinct generations. NVL72-class racks. Federated GPU fabric across all sites.
~944 GPU baseline
FP8/FP4 training-class
InfiniBand / RoCE fabric
L3
Infrastructure

AI Factory

Tonomia · TonoForge™Containerized, modular AI factories. Brownfield-deployable. €2.5 M/MW vs €7–16 M/MW market.
Liquid-cooled · 800 VDC
Black-start capable
30–60 day deployment
L2
Grid & Security

Substation Layer

SiemensPower distribution, MV/LV switchgear, grid-tie equipment, OT security & IEC 62443.
SIPROTEC / SIMATIC
Cyber-physical hardening
Grid-forming capability
L1
Power

Behind-the-Meter

Biomass · CHP · industrial waste-heat partnersUp to 200 MW of contracted, behind-the-meter capacity across Germany.
Biomass cogeneration
Industrial CHP
Curtailed renewables
03 Consortium

Eight founding actors. One federation.

Each member owns one layer of the stack. Together they form a complete operating system for sovereign AI — Germany first, Europe next.

Power

Behind-the-Meter

Biomass cogeneration, industrial CHP, and stranded-power partners.

Layer 01● Anchored
Infrastructure

Tonomia

TonoForge™ containerized AI factories. The structural backbone of the grid.

Layer 03● Founding · Operator
Compute

NVIDIA

Blackwell-class GPUs and reference architectures. Federated across all ökia sites.

Layer 04● Aligned
Hyperscaler

StackIT

Sovereign German cloud. The control plane that makes the federation legible.

Layer 05● Aligned
Models

Aleph Alpha · Cohere

Sovereign LLMs and orchestration. European weights, European inference.

Layer 06● Aligned
Grid & Security

Siemens

Power distribution, OT cybersecurity, grid-forming. The hardening layer.

Layer 02● Aligned
Demand

Deutsche Telekom

National AI off-take. The anchor consumer that underwrites scale.

Layer 07● Aligned
Finance

European Banks · DFIs

Project finance and equity. Off-take-backed structures de-risk the build-out.

Layer 08○ In syndication
04 The Grid

Phase I: Germany. Phase II: Europe.

A topology of brownfield industrial sites, biomass cogeneration plants, and high-voltage stranded-power locations. The first nodes of the European AI grid.

EPSG:4326 · DEU · Phase I roll-out · 2026 — 2028
Anchored
Committed
Pipeline
DELITZSCH Biomass · 8 MW ELSTERWERDA Biomass · 12 MW BERLIN Edge · 2 MW MUNICH Industrial · 20 MW HAMBURG RUHR FRANKFURT STUTTGART BATTICE · HQ PARIS · ’28 WARSAW · ’28 MILAN · ’29 MADRID · ’29 COPENHAGEN · ’28 N 10°E
200 MW
Phase I capacity
7 sites
Active & committed · DE
5 capitals
Phase II · Europe
30–60
Days to deploy a node
05 Why now

The window is three years wide.

Hyperscaler grid backlogs, soaring AI demand, and Europe's stranded-asset map create a once-in-a-generation opening. Whoever builds the federated grid first sets the standard.

01 · Power

Grid bottleneck. Brownfield bypass.

Multi-year interconnect queues across Europe. Meanwhile, hundreds of industrial sites sit on dormant 110 kV+ connections. Co-locating compute with existing power skips the queue entirely.

Source · ENTSO-E TYNDP 2024
02 · Sovereignty

EU AI Act + Schrems III.

Regulatory pressure makes US-only stacks legally untenable for European public-sector workloads. A federated, EU-controlled grid is no longer optional — it's required infrastructure.

Source · Reg. (EU) 2024/1689
03 · Capital

Off-take-backed project finance.

Anchor demand from a national champion (Deutsche Telekom-class) unlocks 15-year contracted cash flows. That's bankable at infrastructure rates — not venture rates. The capital stack writes itself.

Source · ECB sector report Q4 ’25
06 Roadmap

From two sites to a continent.

Phase I anchors Germany. Phase II federates the major European economies. Phase III delivers the operating system.

Q2 · 2026
Consortium constitution

Founding agreement signed. Layer ownership formalized. Public launch event in Berlin.

Q4 · 2026
First two nodes live

Delitzsch and Elsterwerda online via Danpower co-location. ~20 MW federated.

2027
Phase I — Germany complete

7 nodes, 200 MW under contract. Off-take agreement with national anchor consumer.

2028
Phase II — Europe

Paris, Warsaw, Copenhagen come online. Federation crosses borders.

2029+
The Grid OS

ökia operating layer becomes the standard for sovereign AI infrastructure across the EU.

07 Join

Build the grid with us.

ökia is open to industrial power partners, sovereign capital allocators, public-sector off-takers, and engineering firms aligned with the federated thesis.

If you operate stranded power in Europe, deploy industrial AI workloads, or write infrastructure-rate cheques — there's a layer for you.

Tonomia operates the seam. We move first, then federate. Phase I is constituting now.